That Didn't Go As Planned Kids Graphic T-Shirt | Funny Black Cat Youth Tee | Cute Chaos Cat Shirt | Back to School Gift for Boys & Girls
| S | M | L | XL | |
|---|---|---|---|---|
| Width, in | 15.24 | 16.26 | 17.24 | 18.23 |
| Length, in | 20.87 | 22.13 | 23.39 | 24.37 |
| Size tolerance, in | 1.00 | 1.00 | 1.00 | 1.00 |
Sometimes life doesn't go according to plan... and neither does this mischievous black cat! The "That Didn't Go As Planned" youth graphic tee is perfect for kids with big personalities, a great sense of humor, and a love for cats.
Featuring an eye-catching black cat design with a fun, expressive quote, this shirt is perfect for school, weekends, birthdays, Halloween season, or everyday adventures.
Features:
- Soft premium Bella + Canvas youth t-shirt
- Lightweight, breathable cotton blend
- Vibrant, high-quality print
- Unisex fit for boys and girls
- Great for cat lovers and animal fans
- Makes a fun birthday or holiday gift
Perfect for:
- Back to school
- Cat lovers
- Funny kids apparel
- Halloween season
- Everyday wear
- Birthday gifts
- Christmas gifts
Designed by: The Cynic Press Official.
Product features
- Extra lightweight airlume-combed ring-spun cotton for a supremely soft feel (4.2 oz/ydΒ²).
- Retail fit with crew neckline for a modern, comfortable silhouette.
- Side seams and shoulder tape for shape retention and durability.
- DTF inner neck labels and DTG printing for soft, long-lasting graphics.
- Tear-away label and ethically manufactured (Fair Labor Association, Platinum WRAP certified).
Care instructions
- Machine wash: warm (max 40C or 105F)
- Non-chlorine: bleach as needed
- Tumble dry: low heat
- Iron, steam or dry: medium heat
- Do not dry clean
Made with care
Heirloom quality
Premium materials
Classic styling
Styled With